Centrifuge Maintenance Information

FLL-1500WZ Centrifuge Information about the main parameters of the device

The user 
The manufacturerJohn Finlay
ModelFLL-1500WZ
UsageDewater
Series NoFE02-24014 / JFE02-24015
Weight11754 kg
BasketHefei John Finlay Mining Equipment Pty. Ltd.
Equipment dimensions3310mm * 3165mm * 2192mm
Drive motors75kW,380/660V,IP55,P6,3PH,50Hz
vibration motor vibration motor    415 V, the vibration motor is 8.4 kW,IP65,P4,3PH,50Hz
Lubricating machine0.75kW,380/660V,IP55,P4,3PH,50Hz
  • Maintenance of the main components of the equipment
  • Maintain schedules
CycleContentsOperation Notes
weeklyCheck the oil mark Routine inspection of oil quality Check the scale of the filterIf necessary, it will be raised If necessary, replace it   Clean or replace the oil filter 
Monthly“Y” filter Vibrating motors   Lubricating oil circuit and configuration Vibrating motors   Transmission beltscleanup Lubricate the motor – check the Condition of the stroke pointer Routine inspections, if necessary, repairs   Check that the M36 bolts on the two vibrating motors are No fastening Re-tensioning – every 3.5-5.1 kg force required 20mm bending.         
Every 3 monthsLubrication of Bearings on shafts Main bearingsReplace the automatic oiler on the spindle bearing Check the adjusting bearings 
Half yearBolts from the water tank to the sub-cube Shaft inlet part/polyurethane coverCheck the condition, replace it if  it is old or deformed Check if necessary repairs Check the internal and external conditions  
Basket replacementbasket holder   The lining of the discharge section Infeed chuteCheck the condition, replace it if  it is old or deformed Check if necessary on repairs Check the internal and external conditions  

Notes

  1.  The first refuelling must be renewed after 500 hours of operation of the equipment and replaced every 2000 hours thereafter.
    1.  Recommended oil Shell can withstand pressure S2-G100 (tank volume of about 40 L).The drive belt should be checked once after the first 24 hours of operation, and again after 80 hours of operation. Set the automatic oiler (” Simalub “SL-01) to be replaced every 3 months.
    1. Check the adjustment of the bearing/re-adjust the tightness of the expansion sleeve after one month of operation, and then once every 6 months.

Lubrication schedule

Specification Lubricating oil sepcificationLubricating oil quantityHours
75KW driving motor,6 polesL-XBCHA345g3000-4000
0.75KWLubricating machine,4polesN.A- -Pre-oiled and sealed  
Vibrating motorsLGHP2 High-temperature grease60g500
fuel tank: Refueling for the first time Refueling afterwardsShell  pressure-resistant S2-G100  38-40L   38-40L  500   2000
Spindle shaft oil seal  Automatic lubricator SL-01 3 months (adjustable)

Precautions

It is strictly forbidden to weld, cut and do other hot operations on the water tank body to prevent the tiles and wear-resistant mud from falling off.

Before the operation of the equipment, the rotation direction of the vibration motor should be checked, and the rotation direction must be reversed. The basket should be cleaned before the operation of the equipment to prevent the basket or equipment from shaking